Clone of Test Page
The Technology Roadmap is NSW’s headline transport technology strategy. It showcases Transport for NSW’s focus on customers and communities, our strong track record, our technology toolkit and our six priority programs to transform our customers’ transport experience.
- The Technology Roadmap is NSW’s headline transport technology strategy. It showcases Transport for NSW’s focus on customers and communities, our strong track record, our technology toolkit and our six priority programs to transform our customers’ transport experience.
- Two - The Technology Roadmap is NSW’s headline transport technology strategy. It showcases Transport for NSW’s focus on customers and communities, our strong track record, our technology toolkit and our six priority programs to transform our customers’ transport experience.
- Three - The Technology Roadmap is NSW’s headline transport technology strategy. It showcases Transport for NSW’s focus on customers and communities, our strong track record, our technology toolkit and our six priority programs to transform our customers’ transport experience.
Truck Cam List
Cameras
- Bumborah (North)
- - A still image of Bumborah Point Road at Port Botany, near the corner of Botany Road looking North. (Node 1 Cam 1)
- Bumborah (South)
- - A still image of Bumborah Point Road at Port Botany, near the corner of Botany Road looking South. (Node 1 Camera 2)
- Simblist East (East)
- - A still image of Simblist Road at Port Botany, near the Prince of Wales Drive turn off looking East. (Node 2 Camera 1)
- Simblist East (West)
- - A still image of Simblist Road at Port Botany, near the Prince of Wales Drive turn off looking West. (Node 2 Camera 2)
- Simblist West (East)
- - A still image of Simblist Road at Port Botany, near the corner of Friendship Road looking East. (Node 3 Camera 1)
- Simblist West (West)
- - A still image of Simblist Road at Port Botany, near the corner of Friendship Road looking West. (Node 3 Camera 2)
- Foreshore (West)
- - A still image of Foreshore Road at Port Botany, near the corner of Penrhyn Road looking West. (Node 4 Camera 1)
- Foreshore (East)
- - A still image of Foreshore Road at Port Botany, near the corner of Penrhyn Road looking East. (Node 4 Camera 2)
- Friendship (East)
- - A still image of the DP World truck staging area at Port Botany, along Friendship Road looking East. The DP World truck entrance is about 220 metres in the distance. (Node 5 Camera 1)
- Friendship (West)
- - A still image of the DP World truck staging area at Port Botany, Friendship Road looking West. (Node 5 Camera 2)
Bumborah (North) - Current stream

Bumborah (North) - Current stream
(Image refreshes every 15 seconds)
Choose a different stream



Disclosure log list
Agency | Agency reference number | Date released Sort ascending | Description | Contact | Release type |
---|---|---|---|---|---|
Transport for NSW | 21T-1245 | Disclosure Test June02 | |||
TRA-123456 | Tosca Test Service Provider | Partial release | |||
TRA-123456 | Tosca Disclosure | Partial release | |||
Transport for NSW | TRA-120456 | Tosca Disclosure - updated 21Nov24 | Partial release | ||
Transport for NSW | 21T-1051 | Test-Disclosure-07July | Full release | ||
Adam Hester Transport | 27th disclosure | ||||
Transport for NSW | TRA-000456-111 | 210_Test_Disclosure
| email@email.com | Partial release | |
Transport for NSW | 21T-1245 | Documents re: management of John Street between Parramatta Road and Church Street in Lidcombe (the Street) | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-1299 | Details of buses travelling Central Coast Highway at Gosford 6 May 2020 between 4:25pm and 4:40pm | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-1051 | Safety audits for the pop-up cycle ways | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-1002 | All correspondence and advice re road infrastructure and the vehicular access into and out of the proposed Hillsborough Basketball Stadium development | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-1118 | OPAL Data on Route 977 on a daily basis from July 2016 to February 2021 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0980 | All TfNSW Conduct and Ethics Policies | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0851 | Integrated Public Transport Service Planning Guidelines (2013) and Naming convention guidelines for ST and SM lines | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0887 | Passenger numbers at Pennant Hills Station for 2014, 2015, 2016 and month of January 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0832 | Information re route change for 172x bus service, North Balgowlah | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0737 | Proposed new bus stop at Scott St, Newcastle | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0729 | Requesting information on speed cameras | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0542 | Information regarding the decision not to proceed with Cyclepaths on Bridge Road, Glebe covering 2016-2017 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0589 | Information for TfNW project "Planning for rail services west of Bankstown Station in 2024", including the "analysis of travel patterns" dated 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0590 | Information for TfNSW project "Planning for rail services West of Bankstown Station in 2024" community consultation conducted in 2020 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 21T-0593 | Information relating to traffic monitoring on Stoney Creek Road, Bexley from Jun 2020 - Aug 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0561 | Information relating to 2021 Ferry Service Changes Community Consultation Report | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 21S-0023 | Information relating to Road-over-rail bridge on Wilson Way, Blaxland | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0395 | Information relating to concrete pit at Hawkesbury Valley Way | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0498 | Month by Month break up of Patronage figures for Pennant Hills Station for 2017 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0345 | Safety audit carried out in connection with the pop up cycle way on Moore Park Road | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0411 | Concept Plan for Canberra to Eden Railway | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 21T-0393 | List of properties (addresses, purchase price, date of transfer and local government area) acquired for road projects delivered to support the proposed construction of the Western Sydney Airport as at 1 October 2020 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 21T-0366 | Request for recorded traffic incidents which have occurred on Lachlan Valley Way, Boorowa in the period 2010-2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0160 | All information between 1 Jan 2017 and now, concerning tolls, rates of toll increases, heavy vehicle tolls, or toll-free periods | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 21T-0325 | Information relating to the School Crossing Supervisors Program | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0142 | Staff procedures and wearing face masks regarding COVID-19 since 1 February 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0298 | Information relating to NSW boat licence holders | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0234 | All correspondence from NSW Health to Transport for NSW in relation to the wearing of face masks on public transport from Jan 2020 to August 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0263 | All correspondence relating to road safety and camera statistics since 1 Aug 2020 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 21T-0208 | Request for documents relating to speed zone review on Menangle Street, Picton | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 21S-0006 | Briefing notes and reports by Sydney Trains disused tunnels and train platforms | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0767 | Funding offered under the Fixing Country Roads Program | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0991 | Regional Network Performance indicator data | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0089 | Sydney rail network map decal and AM/PM train plans | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0119 | Sydney's Rail Future, Strategic Business Case i | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0094 | NSW Audit Office report recommendations on Mobile Speed Cameras | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0937 | Land acquisition Golden Age Longship Park One Development Pty Ltd | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 21T-0063 | Briefing notes and reports for the NSW Transport about the impact of the COVID-19 pandemic on public transport revenue | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0946 | Number of P2P cameras out of service in NSW | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0962 | Hoxton Park Road Upgrade project | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0929 | Cycleway and shared pathway project funding | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0976 | More Trains, More Service program's upgrade for T8 Airport/South Line, T4 Illawarra Line and South Coast Line | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0901 | Information request in relation to incidents involving Lightrail network | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0840 | Access to all documents prepared by Transport for NSW in relation to the Sydney Metro advertising campaign undertaken between 1 Jul 2019 and 31 Mar 2020 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0836 | Modelling and analysis on the impact of COVID-19 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0838 | All draft versions, reports, briefs, and emails regarding the preparation of the NSW Government transport plan announced on 18 May 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0805 | Terms of Agreement between Sydney Trains and Lane Cove Council for rail plaza at St Leonards Station | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0805 | Terms of Agreement between Sydney Trains and Lane Cove Council for rail plaza at St Leonards Station | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0741 | CSELR End State SCATSIM Modelling Report (GTA) Aug 2016 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0797 | Fatal road accidents in the Hunter Region | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0713 | Roads closures at Blue Mountains and Hunter Valley between 1 Nov 2019 to 29 Feb 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0670 | Passenger numbers at Pennant Hills Station for financial years 2018 and 2019 | Information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0652 | Road closures due to bush fires in NSW and ACT | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0513 | Results of the Community Attitudes to Parramatta Light Rail surveys | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0476 | Amount spent on performers at Light Rail stops on the day/s the Light Rail was launched | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0415 | Documentation related to bus stop cancellation and Bus service 243 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0480 | Lists of expenditure for billboards, posters and outdoor advertising relating to the Light Rail and Metro projects, usually described as “out-of-home” campaigns | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0483 | Expenditure on branded t-shirts on certain campaigns between January 2018 and 26 February 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0481 | List of expenditure for TV and Radio advertising relating to the Light-rail and Metro projects between 1 January 2018 and 26 February 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0479 | List of expenditure for Facebook advertising for the Light Rail and the Metro projects from January 2018 to February 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0478 | Total amount spent on T-shirts relating to the heads up play it safe around the Light Rail campaign | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0401 | Access to traffic modelling regarding Liverpool Moorebank Arterial Road Investigations | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0431 | Information relating to Road Safety Audit Report completed in Oct 2020 about the intersection of Flemington Road and Parramatta Road in Homebush | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0454 | NightRide Services statistics from 1 Jan 2017 to 31 Dec 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0356 | Communications/Customer/Stakeholder Engagement Plan for T3 shutdown for the period from 24 Dec 2019 to 5 Jan 2020. | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0341 | Opal data from Woy Woy Station to Newcastle Interchange since 2016. | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0219 | Patronage data for on demand ferry service in Sydney Bays Precinct since Oct 2019 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 20S-0065 | Barrier gate incidents at Town Hall train station: 31 July 2018 to 31 July 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0241 | Map showing existing, future and potential bus routes through the Sydney North West Growth Centres. | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 20S-0072 | 2009 Cabinet paper for the internal emergency door release fitment to CityRail trains | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | 20S-0073 | Various enquiries regarding T3 Bankstown Line shutdown from 24 Dec 2019 to 5 Jan 2020 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0140 | Information regarding B-line bus service over the past 24 months since 6 December 2017 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0095 | Meriton Planning Proposal at Little Bay | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0096 | Data and information on dormant Opal card account | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0084 | Documents and information relating to the "Community Road Safety Fund" | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | 20S-0047 | Compensation claims relating to Sydney Trains passengers who have missed flights | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0077 | Documentation relating to the NSW Community Road Safety Fund (NCRSF) for 2017, 2018 and 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0045 | Requests to the NSW Transport Minister by Transport for NSW senior executive staff to take trips overseas between 1 July 2018 and 1 July 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0067 | Patronage data for 301, 302 & 303 bus service from 15 July to 16 September 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0070 | Commuter figures at Pennant Hill Railway Station for the period 1 Jan 2019 to 30 Sept 2019 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 20S-0028 | The dates and costs of track work on the North Shore train line in 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0056 | Anonymised list of applicants for assistance under Sydney Light Rail Small Business Assistance Program (SLRSBAP) by post code as of 1/9/19. Anonymised list of applicants approved for assistance under SLRSBAP and approved amount by post code as of 1/9/19 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0050 | Data relating to the 413 Bus Route from July 2017 to present | Information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0029 | Final Review /Report re Changes to Hills Bus Service | Information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 20T-0019 | Patronage of Hillsbus Services before and after the opening of the Sydney Metro | Information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0024 | The total number of crashes that occurred in 2017, 2018 & 2019 involving drivers with specified drugs in their system | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0008 | Total value and percentage of claimed and unclaimed or ineligible M5 cashback trips | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 20T-0007 | 1. The number and value of opal card accounts dormant for 6 months or more, 2. The number and value of opal card accounts dormant for 12 months or more | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0200 | Motor Vehicle Accident Report for intersection of Moverly Road & Anzac Parade, Maroubra between 1 Jan 2013 to 13 Jun 2019 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0164 | Records relating to traffic matters at the intersection of Hawksbury Valley Way and George St in Windsor NSW | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0151 | Briefing Notes, analysis and reports detailing the requirements, costs and benefits of the NSW government buying new ferries for Sydney Harbour and Parramatta River services | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | 19S-0109 | Lapstone Construction Railway | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0117 | Employment contract for Rodd Staples | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 19T-0116 | Monthly patronage figures for on demand transport services for October, November and December 2018 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0113 | Passenger numbers at Pennant Hills Station from 2010 to December 2018 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 19T-0099 | Number of photographs taken of motorists using their mobile phones from 1 July 2018 to 20 November 2018 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0083 | Documents from "Conditions of Approval - Newcastle Light Rail and Associated Road Upgrades (Consolidated May 2017)" | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 19S-0043 | Emergency Policy and Procedures for Heathcote Railway Station | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0078 | Opal Card to permit entry and access to cultural and arts institutions | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 19T-0065 | Changes to the Timetable for Eastern Region (Region 9) Bus Services | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0077 | Costs associated with providing the Station Link services | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 19S-0036 | Peak Train Delays per Cause (Top 20) - Jan 2017 to date and in 2011 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 19T-0049 | Information TfNSW has re Randwick Stabling Yard with the Dept Environment and Heritage | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | 19S-0021 | Information about Work hours of ticket inspectors for Sydney Trains between 01 January 2017 and 02 September 2018 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | 19S-0014 | Information about Hungry Jack's Restaurant Fire Central Sept 2015 | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | 19S-0016 | Information about Planned Track Work - Sydney Trains and NSW Trains | information@transport.nsw.gov.au | Partial release | |
TRA-000628 | Construction of additional tracks for rail corridor between Strathfield and Granville Parramatta | information@transport.nsw.gov.au | Partial release | ||
19T-0016 | Total Revenue into the Public Transport Fund (Parking Space Levy) | information@transport.nsw.gov.au | Full release | ||
19T-0008 | Impact of the changes to the Opal Fare structure | information@transport.nsw.gov.au | Full release | ||
19T-0007 | Usage figures for on-demand transport in New South Wales | information@transport.nsw.gov.au | Full release | ||
19T-0005 | Total cost of providing on-demand transport in Charlestown electorate | information@transport.nsw.gov.au | Full release | ||
TRA-000751 | TAP Priority | information@transport.nsw.gov.au | Full release | ||
TRA-000750 | Kilometres funded by TfNSW for the former Newcastle Buses & Keolis Downers Newcastle | information@transport.nsw.gov.au | Full release | ||
Sydney Trains | STR-000378 | Contracts Summary - Sydney Airport Link transport railway service | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000370 | Information about the removal and replacement of seats at train stations from 1 January 2017 to 10 May 2018 | information@transport.nsw.gov.au | Partial release | |
TRA-000696 | Information about fire and safety assessments at Town Hall and Redfern stations. | information@transport.nsw.gov.au | Partial release | ||
Sydney Trains | STR-000328 | Information about the cost of repairs to Sydney Trains’ assets as at 2 February 2018 and the cost of completed repairs from 1 January 2017 to 2 February 2018 | information@transport.nsw.gov.au | Full release | |
TRA-000659 | Arborists reports about trees in ANZAC Parade along the route of the CBD South East Light Rail. | information@transport.nsw.gov.au | Full release | ||
Sydney Trains | STR-000363 | Information about cancellations of Sydney Trains’ fleet of trains from 1 May 2016 to 1 April 2018 | information@transport.nsw.gov.au | Full release | |
TRA-000698 | Reports and briefings about the provision of student concession Opal cards to international students. | information@transport.nsw.gov.au | Full release | ||
TRA-000689 | Information about planning, traffic and parking arrangements for Barangaroo, the Rocks and the vicinity. | information@transport.nsw.gov.au | Partial release | ||
TRA-000645 | Information about the cost and usage of on-demand transport in NSW. | information@transport.nsw.gov.au | Full release | ||
Sydney Trains | STR-000349 | Reviews and briefing notes about Sydney Trains’ Making it work for you program between 26 March 2017 and 26 March 2018 | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | STR-000361 | Information about the carbon dioxide emissions from Sydney Trains’ fleet | information@transport.nsw.gov.au | Full release | |
TRA-000643 | Information about archaeological finds along the route of the CBD South East Light Rail in 2015 – 2016. | information@transport.nsw.gov.au | Full release | ||
TRA-000641 | Briefing notes about the introduction of a new train timetable in November 2017 | information@transport.nsw.gov.au | Full release | ||
Sydney Trains | STR-000326 | Statistical information about the recruitment and resignation of train drivers from 20111 to 2018 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000340 | Information about the cost of taxi fare travel taken by Sydney Trains’ employees from March 2017 to March 2018 | information@transport.nsw.gov.au | Full release | |
TRA-000671 | Information about a 15% budget cut in Transport for NSW.
| Full release | |||
TRA-000640 | Draft and final reports by a consultant about the introduction of a new train timetable in November 2017. | information@transport.nsw.gov.au | Full release | ||
TRA-000655 | Information prepared by Transport for NSW about the Federal Government’s National Rail Program for the Wollongong-Sydney rail corridor. | information@transport.nsw.gov.au | Partial release | ||
Sydney Trains | STR-000333 | Briefing notes and reports by Sydney Trains about the introduction of a new train timetable in November 2017 | information@transport.nsw.gov.au | Full release | |
TRA-000629 | Ministerial briefings about roadside drug testing. | information@transport.nsw.gov.au | Partial release | ||
TRA-000665 | Information about complaints made concerning Newcastle public transport in 2017 and 2018
| Full release | |||
TRA-000660 | Information about requests by government agencies for Opal card travel details by customers | information@transport.nsw.gov.au | Full release | ||
Transport for NSW | TRA-000619 | Information about proposals for a new train station in the Lower Hunter or the Maitland electorate. | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000612 | Correspondence between TfNSW and the NSW Department of Family and Community Services about the Waterloo Sydney Metro Station | information@transport.nsw.gov.au | Full release | |
TRA-000645 | Information about the cost and usage of on-demand transport in NSW. | information@transport.nsw.gov.au | Full release | ||
Transport for NSW | TRA-000618 | Information about gender equality in the Senior Executive Service across the NSW Transport cluster from 15 Jan 2018 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000316 | Information about Sydney Trains’ maintenance backlog, the total value of maintenance and the total value of assets for 2016-17 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000635 | Information about the total amount of money spent on legal costs for the CBD south east light rail and the Sydney Metro project.
| Full release | ||
Sydney Trains | STR-000327 | Information about train delays, skipped stops and cancellations in late 2017 and early 2018 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000313 | Information about complaints received by Sydney Trains. Information about trains skipping stops, cancellations and delays | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000605 | Information about train passenger numbers from the Blue Mountains to Redfern and rail timetable changes that affect Redfern station and the western line
| Partial release | ||
Transport for NSW | TRA-000615 | Information about the advertising campaign to promote the WestConnex Motorway including costs of the campaign | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | STR-000322 | Information about train cancellations between 1 Nov 2017 to 23 Jan 2018 and from 1 Feb 2016 to 23 Jan 2018 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000604 | Information about transport options between Mt Victoria and Lithgow
| Partial release | ||
Transport for NSW | TRA-000573 | Information about a date night advertisement on the TfNSW website on 26 October 2017
| Partial release | ||
Transport for NSW | TRA-000586 | Correspondence to and from the Secretary of TfNSW
| Partial release | ||
Transport for NSW | TRA-000588 | Information about naming a Sydney Ferry Ferry McFerryface | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000303 | Information about a free Wi-Fi trial at Circular Quay Railway Station | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000593 | Information about the construction of lifts at Tuggerah Railway Station
| Partial release | ||
TRA-000592 | Information about 7 Darley Road Leichhardt | information@transport.nsw.gov.au | Partial release | ||
Transport for NSW | TRA-000585 | Correspondence between TfNSW and the NSW Transport Minister about naming a Sydney Ferry Ferry McFerryface | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | STR-000308 | Information about train set types used on the Sydney Trains’ network prior to and after 26 November 2017 when a new train timetable was introduced | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000579 | Information about the introduction of fares on the free gong shuttle service | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000576 | Information about the introduction of fares on the free gong shuttle service
| Partial release | ||
Transport for NSW | TRA-000596 | Correspondence between TfNSW and NSW Trade & Investment about the Port of Eden Safe Harbour Project.
| Full release | ||
Transport for NSW | TRA-000580 | Information about meetings held between the NSW Transport Minister and the NSW Taxi Council in 2017 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000564 | Information about the New Intercity Fleet Maintenance Facility at Kangy Angy | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000484 | Information about the age and maintenance of Sydney buses
| Full release | ||
Transport for NSW | TRA-000581 | Information about the impact of changes to the Opal fare structure in 2016
| Full release | ||
Transport for NSW | TRA-000534 | Information about the XPT fleet
| Partial release | ||
Sydney Trains | STR-000300 | Information about and the cost of seating rails installed at train stations since January 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000291 | Information about the vehicles used in the Sydney Trains’ Emergency Response Unit | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000563 | Information about revenue and expected revenue obtained from public transport fares from 2015 - 20
| Full release | ||
Sydney Trains | STR-000296 | Percentages of trains that were running late in 2016 - 17 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000293 | Information about the James Street Bridge at Lithgow | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000257 | Information about fire and safety risk assessments for Town Hall Station since 2014 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000552 | Transport for NSW business case about the Next Generation Infrastructure Services | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000509 | Information about the Central Station Precinct Renewal program | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000553 | Information about safety checks on Sydney Metro trains | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000481 | Information about assessment for Transport Access Programs for train stations since October 2016
| Partial release | ||
Transport for NSW | TRA-000472 | Information about the Rail Corridors Strategy Sydney to Wollongong
| Partial release | ||
Transport for NSW | TRA-000554 | Information about an investigation into the disclosure of confidential Transport for NSW information
| Full release | ||
Transport for NSW | TRA-000503 | Briefs to the NSW Minister for Transport from Transport for NSW, the Auditor General or NSW Treasury about the CBD South East Light Rail from January 2016 to August 2017 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000545 | Information about Transport for NSW tactical communications meetings between 1 February 2017 and 26 September 2017 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000508 | Information about Opal card complaints from January 2016 to 30 September 2017
| Full release | ||
Transport for NSW | TRA-000502 | Information about overseas travel taken by Transport for NSW staff since 5 April 2015 | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | STR-000262 | Money spent by Sydney Trains in paying taxi fares for stranded train passengers and details of each individual taxi trip from June 2015 to September 2017 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000263 | Information about the number of occurrences of trains not stopping at scheduled train stations from 1 August 2015 to 1 August 2017 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000483 | Information about an interest free loan proposal to the Taxi Council of NSW
| Full release | ||
Transport for NSW | TRA-000512 | Letter dated 10 February 2017 from Transport for NSW to the NSW Auditor General about the CBD and South East Light Rail
| Full release | ||
Transport for NSW | TRA-000493 | Information about an investigation by TfNSW into leaks of TfNSW information - Item 15
| Full release | ||
Transport for NSW | TRA-000493 | Information about an investigation by TfNSW into leaks of TfNSW information - Items 1-14
| Full release | ||
Transport for NSW | TRA-000492 | Information about the assessment matrix for various train station upgrades under the TAP program since March 2011
| Full release | ||
Transport for NSW | TRA-000500 | Report about the B-Line bus shelter at Kitchener Road Mona Vale
| Full release | ||
Transport for NSW | TRA-000485 | Information about the All Aboard Workshop and the Minecraft Workshop and FastTracking the Future Education program
| Full release | ||
Transport for NSW | TRA-000491 | Information about NSW Business Connect contact with businesses affected by the construction of the CBD South East Light Rail | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000443 | Information about Sydney Metropolitan bus services contracts and the number of bus passenger trips by region
| Full release | ||
Transport for NSW | TRA-000467 | Information about the ranking and criteria for train stations, including Unanderra train station, under the TAP program | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000402 | A report dated July 2015 about the Sydney Metro and long term transport planning
| Full release | ||
Transport for NSW | TRA-000447 | Information about increasing capacity and service frequency on Sydney Inner West Light Rail | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000450 | Information about complaints concerning bus operators and bus patronage by region
| Full release | ||
Transport for NSW | TRA-000469 | Information including costs about the TfNSW app Feedback2go and complaints lodged through the app since 16 September 2016
| Full release | ||
Transport for NSW | TRA-000473 | Information about 7 Darley Road Leichhardt | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000455 | Information about land owned by RailCorp in Darley Road Leichhardt | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000470 | Information about the train model used on the airport, inner west & south line and the Cumberland lines from January 2017 to June 2017 broken down by daily and weekly details.
| Full release | ||
Transport for NSW | TRA-000458 | Information about the TAP assessment process for train station upgrades
| Full release | ||
Transport for NSW | TRA-000432 | The number of trips taken on the inner west and south train lines from July 2016 to December 2016
| Full release | ||
Transport for NSW | TRA-000449 | Information about land owned by RailCorp in Darley Road Leichhardt
| Partial release | ||
Transport for NSW | TRA-000441 | Information about the Point to Point Transport Commission - Initial release
| Partial release | ||
Transport for NSW | TRA-000441 | Information about the Point to Point Transport Commission - Supplementary release
| Partial release | ||
Transport for NSW | TRA-000442 | Information about 7 Darley Road Leichhardt - Initial release
| Partial release | ||
Transport for NSW | TRA-000442 | Information about 7 Darley Road Leichhardt - Supplementary release
| Partial release | ||
Transport for NSW | TRA-000380 | Information about 7 Darley Road Leichhardt | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000429 | Information about tree removal at Mona Vale Village Park for the B-line bus project
| Full release | ||
Transport for NSW | TRA-000395 | Information about privacy implications relating to the release of Opal data
| Partial release | ||
Transport for NSW | TRA-000424 | Information about the Road Safety Council
| Full release | ||
Transport for NSW | TRA-000381 | Information about land acquired for the B-line bus project
| Full release | ||
Transport for NSW | TRA-000412 | Information about correspondence between the NSW Minister for Transport and the Federal Government about proposed changes to the Sydney Airport Demand Management Act
| Full release | ||
Transport for NSW | TRA-000399 | Information about school bus safety and the installation of seatbelts in school buses | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000361 | Information about the Chatswood to Epping permanent bus stop concept design report | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000400 | Information about the total number of vehicle accidents and statistics involving drivers with drugs in their system for 2014-16 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000365 | Information about the ferry Catherine Hamlin | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000378 | Information about correspondence between Transport for NSW or Sydney Trains and the Asset Standards Authority about an audit identifying areas of concern about assets | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000413 | Information about briefings to the TfNSW Audit & Risk Committee about the CBD & South East Light Rail
| Partial release | ||
Transport for NSW | TRA-000367 | Information about lost, stolen, ineligible and replaced Gold and Silver OPAL cards | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000367 | Information about stolen and lost gold and silver Opal cards and the number of gold Opal cards cancelled | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000382 | Information about the costs of the 2017 Travel Choices Festival | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000197 | Information about environmental reports about railway owned land adjacent to Hawksbury River Railway Station | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000351 | Information about the F6 and options | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000357 | Information about works for the new Intercity Fleet program | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000198 | Information about the number of Sydney Trains’ fleet that are not airconditioned | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000350 | Information about a list of contracts for the Sydney Metro Northwest Skytrain Viaduct | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000606 | Information about the tender and business case for the T4 upgrade. | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000340 | Information about the costs of the George Street is Open for business and Christmas Rap videos | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000353 | Information about changes to the Opal fare structure in NSW | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000328 | Information about the proposed Wickham Interchange | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000322 | Information about the locations of new speed and red light cameras | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000314 | Information about malfunction of Opal readers on buses | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000319 | Information the future use of the former Newtown Tram Depot site | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000316 | Information about point to point speed cameras | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000307 | Information about projects funded by the Park and Travel Safety Fund | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000290 | Information about tree removal for the Sydney CBD South East Light Rail Project | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000273 | Information relating to contracts awarded as part of the Transport Equip Program | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000272 | Information relating to the current progress, total cost, expected completion date and expected date buses will be operational for the Northern Beaches B-Line bus service | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000276 | Information about the delivery of double decker buses | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000280 | Information relating to complaints about Sydney's Ferries | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000160 | Amount spent on removing graffiti from 2014 - 2016 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000260 | The MOU for the Exchange of Opal Information between TfNSW and NSW Police, business rule for disclosure of Opal information to law enforcement agencies and number of requests for opal information made by law enforcement agencies | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000258 | Information about the number of times Opal card users paid the default fare from Jan 2015 to Jun 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000139 | Information about complaints received relating to cleanliness of Sydney Trains train stations and carriages from 2014 - 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000136 | Information about the number of safety inspections of the train fleet undertaken by Sydney Trains from 2014 - 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000141 | Information about the numbers of train drivers suspended from 2014 - 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000137 | Information about the 10 train stations that receive the highest number of complaints from 2014 – 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000142 | Information about the number of trespass incidents on Sydney Trains’ property from 2014 – 2016 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000198 | Information relating to the Parking Space Levy review | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000192 | Information relating to the cost and results of Mobile Drug Testing | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000194 | Information relating to advice from TfNSW to IPART on the technical limitations of the Opal System | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000202 | Information about student train pass privileges removed 2013-2015 calendar years | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000186 | Information relating to the Transport Advisory Board | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000179 | Information relating to the Sydney Metro fleet | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000171 | Information relating to Train Loads during peak hours | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000149 | Parramatta River Long-Term shoreline monitoring study June 2001 and Extension to the Parramatta River Long-Term Shoreline Monitoring Study May 2006 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000158 | The budgeted cost for developing the 'OPAL Man' brand and advertising for the OPAL Card acquisition campaign | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000140 | Information relating to the funding of the proposed Byron Bay Bypass | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000147 | Information about future planned tree removal April - July 2016 in relation to the CBD and South East Light Rail Project | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000137 | Modelling and traffic management plans for the CBD and South East Light Rail | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000142 | Total value of invoices for legal services provided by Henry Davis York to TfNSW between March 2011 and March 2016 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000095 | Information about freight train breakdowns and disruptions | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000125 | Information relating to the Parramatta Light Rail route | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000139 | Information relating to the budget for the installation of Opal top up machines, and the number of machines installed | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000133 | Information relating to extending SSTS to Light Rail | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | STR-000084 | Information about the number of Sydney Trains’ service cancellations during peak hours | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000083 | Information about the number of trains that have skipped stops at scheduled stations | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000074 | Information about the number of occasions where a Sydney Trains’ service was interrupted or cancelled due to vandalism | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000110 | Information relating to the compulsory identification laws for cyclists | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000101 | Number of school travel privileges temporarily suspended or permanently cancelled due to misbehaviour on school buses from July-Dec 2015 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000100 | Number of registered and unregistered OPAL cards with a negative balance as of 7 January 2016 and 1 January 2015 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000094 | Number and value of default fares charged (across all modes) on a monthly basis from November 2014 to October 2015 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000061 | Figures for permanent Full Time or Full Time Equivalent employees, consultants and contractors as at October 2014 and October 2015 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000072 | Reports regarding Central Coast Train Stabling and Maintenance Facility Concept Options Development and Comparative Site Analysis | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000065 | Modelling or analysis commissioned by or for TfNSW into the development precincts proposed for the Central to Eveleigh corridor and the Bays Precinct within 2014 or 2015 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000060 | Documents relating to use of Glebe Island Bridge | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000068 | Contracts between TfNSW and oOh! Media relating to the provision of services for the purpose of the Opal Card rollout | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000070 | Community Road Safety Fund - annual budgets, spend and projects funded | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000084 | Community Road Safety Fund - annual budgets, spend and projects funded | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000071 | The number of customer movements through Leppington Station and Edmondson Park Station from 9 February 2015 to 30 September 2015 based on Opal data | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000042 | Information regarding safety inspections of Sydney Trains fleet in 2010, 2011, 2012, 2013, 2014, 2015 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000048 | Numbers of particular types of trains (Waratah, Millennium, Tangara, C Set, S Set, K Set) currently in operation and 2015/16 budget for maintenance of these trains | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000064 | Information relating to the reasoning behind a claim that a planned new train line from Chatswood to Sydenham as well as some works on the Western Line would lead to a 60 percent increase in capacity in rail in Sydney | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000039 | Information relating to the number of replaced OPAL cards | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000049 | Information relating to the number of off street commuter car parks on the Sydney Trains network | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000015 | Information relating to the truncation of Newcastle's heavy rail line | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000052 | Information relating to suspended or cancelled school travel privileges for misbehaviour on school buses | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000045 | Train stations in the Blue Mountains currently subject to plans to upgrade to wheelchair accessibility. Assessment criteria used to determine suitability for train station upgrade to wheelchair accessibility | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000029 | Current and proposed staff numbers for each railway station and gate counts for each station | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000043 | A breakdown of all the costs associated with the “Tomorrow’s Sydney” Advertising Campaign | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000017 | Total numbers of trespass incidents for each train line for the following years: 2012, 2013, 2014, 2015 and monetary value of damage caused by vandals and those trespassing for each of these lines and years | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000018 | Figures regarding key cards and keys which access trains, train stations building maintenance centres, buses or stabling yards in the following years: 2012, 2013, 2014, 2015 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000022 | Information relating to wheelchair access at train stations and plans for those stations to be upgraded over the 2015-2016 financial year | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000019 | Money spent on updating transport signage to the new numeral and number based coding system | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000006 | Information regarding repairs and tenders for repairs for Hawkesbury Bridge | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000001 | Overview of customer complaints from 1 July 2011 to 1 June 2015, broken down on a month by month basis and into complaint categories for: Sydney Trains, NSW Trains, Sydney Buses, Sydney Ferries (Harbour City Ferries), Light Rail | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 1415G-1806 | Correspondence between the Project Director, SLR, and the City of Sydney in relation to the construction of the Light Rail Project during 1 July 2014 to 26 May 2015 | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | TRA-000007 | Heavy Vehicle Compliance Surveys (NSW) 2009 and 2012 | information@transport.nsw.gov.au | Partial release | |
Sydney Trains | STR-000004 | Number of train drivers suspended from period 1 April 2015 to 26 June 2015 | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000003 | Amount spent on taxi fares for stranded passengers by Sydney Trains/NSW Trains from 1 July 2011 till 1 June 2015 on a year by year basis | information@transport.nsw.gov.au | Full release | |
Transport for NSW | TRA-000009 | Information relating to disability access at train stations, funding and plans for future access upgrades to train stations | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 1415G-1046 | Information relating to the Parliamentary Inquiry on the Planning Process in Newcastle and Broader Hunter Region | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 1415G-1717 | Contractual Performance Indicators across all modes of public transport in NSW | information@transport.nsw.gov.au | Full release | |
Sydney Trains | STR-000001 | Total numbers of Sydney Trains/NSW Trains service cancellations from 1 July 2013- 1 June 2015 | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 1415G-1777 | Information relating to law-enforcement agency access to Opal card records | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 1415G-1768 | Information relating to costs associated with the Albert “Tibby” Cotter Walkway over Anzac Parade in Moore Park, Sydney | information@transport.nsw.gov.au | Partial release | |
Transport for NSW | 1415G-1623 | Information relating to property acquisitions for the North West Rail Link and the CBD and South East Light Rail project | information@transport.nsw.gov.au | Full release | |
Transport for NSW | 1415G-1550 | Information relating to the number of OPAL cards in existence and funds held in OPAL card accounts | information@transport.nsw.gov.au | Full release |
Standard List
Total results: 546
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | AC auxiliary supplies | EP 05 00 00 01 SP | Substation Auxiliary Transformer from Rectifier Transformer Secondary | 2.1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
AEO | AEO authorisation toolkits | T MA MD 00009 F1 | AEO Engineering Services Matrix - Maritime | 1 |
AEO | AEO authorisation toolkits | T MU CY 10503 GU | AEO Guide to Engineering Competence Management | 1 |
AEO | AEO authorisation toolkits | T MU MD 00009 F1 | AEO Engineering Services Matrix | 4 |
AEO | AEO authorisation toolkits | T MU MD 00009 SP | AEO Authorisation Model | 3 |
AEO | AEO authorisation toolkits | T MU MD 00009 ST | AEO Authorisation Requirements | 3 |
AEO | AEO authorisation toolkits | TS 10504: 2013 | AEO Guide to Engineering Management | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Track | Alignment and Transit Space | SPC 213 | Trackside Signs | 2.2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
All disciplines | XYZ 12345678 | Tosca OverBridge | 1.0 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Telecommunications | Applications | T MU TE 61005 ST | Customer Information Systems for Public Transport Buildings and Conveyances | 2 |
Telecommunications | Applications | T MU TE 61007 ST | Time Synchronisation of Industrial Automation and Control Systems | 1 |
Telecommunications | Applications | T MU TE 90001 TI | Application of Telecommunications Standards to Engineering Works and Services | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Auxiliary services | PTA EL148/2018 | 125V dc battery charger | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Stations & Buildings | Building Services | T HR SS 80002 ST | Low Voltage Electrical Installations | 2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Telecommunications | Cables and Routes | T HR TE 01002 ST | Signalling Bungalow Communications Cabling | 1 |
Telecommunications | Cables and Routes | T MU TE 01005 ST | Optical Fibre Cable | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Construction specifications | SPG 0706 | Installation of Trackside Equipment | 2.3 |
Signals and control systems | Construction specifications | SPG 0707 | Installation of Equipment Racks and Termination of Cables and Wiring | 1.5 |
Signals and control systems | Construction specifications | SPG 0724 | Level Crossing Protection Equipment - Installation | 1.4 |
Signals and control systems | Construction specifications | SPG 1253 | Signalling Control Systems IPC Level Interface Specification | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | DC switchgear | EL 00031 | UGL type HFT truck mounted 1500V DC Harmonic Filter, 600 and 1200Hz, complete with castell key interlocked Schaltbau isolating switch and surge arrester | 2 |
Electrical | DC switchgear | EP 04 00 00 02 SP | System Substation 1500 V DC Links and Switches | 2.1 |
Electrical | DC switchgear | EP 04 01 00 01 SP | 1500V DC High Speed Feeder Circuit Breaker | 3.1 |
Electrical | DC switchgear | EP 04 02 00 01 SP | 1500V DC High Speed Rectifier Circuit Breaker | 2.1 |
Electrical | DC switchgear | PTA EL124/2017 | 1500V Mitsubishi DCCB with 1500V DC feeder protection relay | 1 |
Electrical | DC switchgear | PTA EL199 2019 | 1500V Mitsubishi DCCB with 1500V DC feeder protection relay | 1 |
Electrical | DC switchgear | PTA EL216 2020 ver 2 | 1500 V DC metalclad enclosed switchgear | 2 |
Electrical | DC switchgear | T HR EL 04001 SP | Heavy Rail Traction System – 1500 V DC Metal Enclosed Switchgear | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Distribution network | EL 00013 | Distribution padmount assembly | 1 |
Electrical | Distribution network | EL 00034 | Schneider hermetically sealed 11 kV/415V, 500kVA, Dyn1, ONAN, GMX ground mounted auxiliary transformer. Restricted approval, see Type Approval Certificate for details | 1 |
Electrical | Distribution network | PTA EL00097 2020 | Invert culvert and plinth | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Distribution transformers | PTA EL132 2017 | 11kV/433V, 2 MVA, dry type, cast resin transformer for indoor substations | 1 |
Electrical | Distribution transformers | PTA EL213 2021 | 11kV/433V, 100kVA, 3-phase, ONAN pole top distribution transformer | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Assembly 84M Clawlock | M10-834 | M10-834 Clawlock In Front Inbearer And Backdrive Stretcher Bar In Rear Inbearer | 2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Assembly 84M Spherolock | M10-704 | M10-704 84M Point Machine on 60 kg Tangential Turnout Radius 160/190M with Spherolock in Inbearer | 1 |
Signals and control systems | Drawings - Points Assembly 84M Spherolock | M10-734 | M10-734 Spherolock In Front Inbearer And Backdrive Stretcher Bar In Rear Inbearer | 2 |
Signals and control systems | Drawings - Points Assembly 84M Spherolock | M10-754 | M10-754 84M Spherolock Tangential Bladed Catchpoint on Inbearer Beams (Motor the Same /Opposite side to Blade) | 1 |
Signals and control systems | Drawings - Points Assembly 84M Spherolock | M10-764 | M10-764 84M Spherolocks on Tangential Bladed Independent Point Using Double Side Scarfed Inbearer Beams | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Assembly EP Clawlock | M02-619 | M02-619 EP Clawlock Component Details For 125mm Bore Air Motor | 5 |
Signals and control systems | Drawings - Points Assembly EP Clawlock | M10-670 | M10-670 160/190m Tangential Turnout | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Assembly EP Spherolock | M10-705 | M10-705 Radius 160/190m | 2 |
Signals and control systems | Drawings - Points Assembly EP Spherolock | M10-735 | M10-735 Front Bearer Backdrive Strecher Bar In Rear Inbearer | 4 |
Signals and control systems | Drawings - Points Assembly EP Spherolock | M10-755 | M10-755 Tangential Catchpoints | 2 |
Signals and control systems | Drawings - Points Assembly EP Spherolock | M10-765 | M10-765 EP and Spherolock with Tangential Bladed Independent Catchpoint on Double Sided Scarfed Inbearer Beams | 1 |
Signals and control systems | Drawings - Points Assembly EP Spherolock | M10-775 | M10-775 8 pgs in book format (v.1) - Double EP & Single Spherolocks Tangential Bladed Independent Point on Normal Scarfed Inbearer Beams | 2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Assembly Generic | M04-123 | M04-123 Typical Tangential Turnout | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Components 84M | M02-640 | M02-640 M84 Point Machine Hand/Motor Lever Mods For Mounting On Drive Rod side | 1 |
Signals and control systems | Drawings - Points Components 84M | M02-644 | M02-644 Deflector Plate For M84 Point Machine With Levers On Drive rod side | 1 |
Signals and control systems | Drawings - Points Components 84M | M02-646 | M02-646 Operating bar Detection Bracket For 180mm Detection Range | 1 |
Signals and control systems | Drawings - Points Components 84M | M02-652 | M02-652 Operating Bar complete For Tangential Points For M84 with or without Backdrive | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Points Components EP | M02-641 | M02-641 Air Motor Baseplate For Mounting between Cologne Eggs On Conc Slab | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Signals Assembly | M01-167 | M01-167 Non-Standard Signal Posts - 3, 4, 5 and 6M Signal Post Examples - Platforms and Ladders Layouts (rev A) | 3 |
Signals and control systems | Drawings - Signals Assembly | M01-172 | M01-172 Standard Signal Posts - 3.5, 4.55 and 5.6M Signal Post Examples - Platforms and Ladders Layouts (rev A) | 1 |
Signals and control systems | Drawings - Signals Assembly | M01-179 - 180 | M01-179 and 180 Standard Single and Double Light Signal Forms | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Signals Components | M01-160 - 137 | M01-160 to 307 Light Signal Post and Associated Parts | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Drawings - Standard Installations | M12 | M12 Series Standard Installation Drawings | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Earthing, bonding electrolysis | EL 00032 | Rail spark gap with SDS1 spark gap unit (part number 923110) and associated MA SDS M12 mast adapter | 1 |
Electrical | Earthing, bonding electrolysis | EP 12 10 00 10 SP | System Substation Earthing | 3 |
Electrical | Earthing, bonding electrolysis | EP 12 10 00 11 SP | Distribution Substation Earthing | 3 |
Electrical | Earthing, bonding electrolysis | ETN 01/06 | Segregation of earths on poles - Safety Issues | 1 |
Electrical | Earthing, bonding electrolysis | ETN 11/02 | Earthing Designs for RailCorp's High Voltage AC System | 3 |
Electrical | Earthing, bonding electrolysis | ETN 12/04 | OHW Permanent Rail Connections | 1 |
Electrical | Earthing, bonding electrolysis | PTA EL198 2021 | Voltage Limiting Device (VLD) also known as Auto-Rail Earth Contactor (REC) in the RailCorp Electrical Network | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Fleet | Electrical | T BU FL 01701 ST | Mounting and Installation of Electrical Equipment | 1.0 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
All disciplines | Engineering Procedures | XYZ 0005678-000 | 210_Test_OverBridge | 2.10 |
All disciplines | Engineering Procedures | XYZ 0005678-000 | 210_Test_OverBridge | 2.10 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Equipment specifications | SPG 0723 | Level Crossing Equipment Manufacture and Assembly | 1.3 |
Signals and control systems | Equipment specifications | SPG 1210 | Signalling Signs and Instruction Plates | 1.6 |
Signals and control systems | Equipment specifications | T HR SC 01250 SP | Signalling Interlocking and Traffic Management System Interface | 3 |
Signals and control systems | Equipment specifications | T HR SC 01251 SP | Signalling Control Systems Interface Requirements | 5 |
Signals and control systems | Equipment specifications | T HR SC 01650 SP | ETCS Onboard Equipment | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Fault protection | EL 00020 | P14N & P14D protection relays | 1 |
Electrical | Fault protection | EL 00095 | 1500 V DC feeder protection relay (UMLE) 90-250 V DC type 2 power supply, single bus V | 1 |
Electrical | Fault protection | EP 19 00 00 03 SP | Commissioning of Translay Pilot Wire Protection Scheme | 2.1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | General | EP 00 00 00 15 SP | Common Requirements for Electrical Power Equipment | 3.1 |
Electrical | General | T HR EL 00004 ST | Buildings and Structures under Overhead Lines | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Civil | Geotechnical Standards | T HR CI 12130 MA | Track Drainage | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | HV aerial lines | PTA EL179 2019 | Valmont Steel Poles | 1 |
Electrical | HV aerial lines | PTA EL180 2019 | Wagner Composite Fibre Crossarms | 1 |
Electrical | HV aerial lines | PTA EL181 2019 | ABB low voltage limiter type HVL 120-0.3 | 1 |
Electrical | HV aerial lines | PTA EL182 2019 | MacLean Power Systems composite line post insulator H2 9C 20 023 MX SS 012 | 1 |
Electrical | HV aerial lines | PTA EL183 2019 | MacLean Power Systems composite line post insulator NPKG 10 XB 003 S0 | 1 |
Electrical | HV aerial lines | T HR EL 10001 ST | HV Aerial Line Standards for Design and Construction | 2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | HV cable | PTA EL209 2020 | Termination for 33 kV screened single core XLPE insulated cables 500-630 mm2 | 1 |
Electrical | HV cable | PTA EL210 2020 | Joint for 33 kV screened single core XLPE insulated cables 630 mm2 | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | HV harmonic filter | PTA EL131 2017 | 33kV, 4Mvar, C-type, harmonic filter. Restricted approval, see Type Approval Certificate for details | 1 |
Electrical | HV harmonic filter | PTA EL241 2020 | 11kV, 2 MVAR, C-type, harmonic filter. Restricted type approval site specific for Blacktown North SS. See the Type Approval Certificate for details. | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Inbearer Layouts - Points components | M02-170 | M02-170 Claw Pin (Shoulder Bolt) And Retainer For Claw Locks On Tangential Turnouts - Details | 4 |
Signals and control systems | Inbearer Layouts - Points components | M02-282 | M02-282 Tangential Turnouts Claw Lock EP Drive Detr Rods - Material List | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Interface agreements/arrangements | TMG A1620 | Level Crossing - Traffic Signal Design Interface Agreement | 2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Low voltage | ETN 13/05 | Low Voltage Switchboard Maintenance | 1 |
Electrical | Low voltage | PTA EL139/2018 | Low Voltage Isolating Transformer | 1 |
Electrical | Low voltage | PTA EL226 2020 | Low voltage isolating transformer | 1 |
Electrical | Low voltage | T HR EL 17001 F1 | Information Regarding Applications for Connection | 1 |
Electrical | Low voltage | T HR EL 17001 F2 | Application for Connection | 2 |
Electrical | Low voltage | T HR EL 17001 F3 | Application for Temporary Connection | 2 |
Electrical | Low voltage | T HR EL 17001 ST | Electrical Distribution System Installation Connection and Inspection | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Telecommunications | Network | T MU TE 41001 ST | Packet Switched Networks Wired Networks | 1 |
Telecommunications | Network | T MU TE 41003 ST | Radiocommunication in LIPD Class Licensed Bands | 1 |
Telecommunications | Network | T MU TE 41004 ST | Packet Switched Networks - Wireless Local Area Networks | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Telecommunications | Network Management | T MU TE 81002 ST | Telecommunication Equipment Network Management | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Telecommunications | Power Systems and Facilities | T HR TE 21002 ST | Communications Earthing and Surge Suppression | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Power transformers | EL 00019 | 33/11kV, 5/6.25MVA, ONAN/ONAF, complete with OLTC | 1 |
Electrical | Power transformers | EL 00080 | 33kV/600V/600V, 5.35MVA ONAN, 33kV cable connected, complete with off-circuit tapchanger | 1 |
Electrical | Power transformers | EP 02 00 00 01 SP | Transformer Loss Evaluation | 3.1 |
Electrical | Power transformers | EP 02 44 00 01 SP | 11kV Voltage Regulator | 2.1 |
Electrical | Power transformers | PTA EL110/2017 | Power transformer | 1 |
Electrical | Power transformers | PTA EL192 2019 | Power Transformer | 2 |
Electrical | Power transformers | PTA EL193 2021 | 33/11kV, 7.5/9.25MVA, ONAN/ONAF, complete with OLTC | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Electrical | Rectification | PTA EL111/2017 | Traction Rectifier Transformer | 1 |
Electrical | Rectification | PTA EL184 2019 | Traction Rectifier Transformer | 1 |
Electrical | Rectification | T HR EL 03001 ST | Controls and Protection for 1500 V dc Rectification Equipment | 1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Rolling Stock | Road Rail Vehicle and Small Plant Re-Certification | T HR RS 30020 F3 | Approved compliance testing companies | 1.2 |
Rolling Stock | Road Rail Vehicle and Small Plant Re-Certification | T HR RS 30040 F1 | Engineering certification - Category B engineering report form | 1 |
Rolling Stock | Road Rail Vehicle and Small Plant Re-Certification | T HR RS 30040 F2 | Engineering certification - Category C engineering report form | 1 |
Rolling Stock | Road Rail Vehicle and Small Plant Re-Certification | T HR RS 30040 F3 | Engineering certification - Vehicle structural shear force and bending moment diagrams | 1 |
Rolling Stock | Road Rail Vehicle and Small Plant Re-Certification | T HR RS 30040 ST | Engineering certification of road/rail vehicles, trolleys, trailers and quadricycle | 1.1 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Signals and control systems | Rolling stock interface | T HR SC 00006 ST | Rolling Stock Signalling Interface Requirements | 2 |
Discipline | Sub-discipline | Document number Sort descending | Document title | Ver. |
---|---|---|---|---|
Rolling Stock | Rolling stock procedures | EPR 0026 | Static vehicle weigh test | 1.1 |
Rolling Stock | Rolling stock procedures | EPR 031 | Test for the operation of two pipe brake systems | 1 |
Unforeseen Events list
Reported by | Description | Date occurred Sort ascending | Start time | Date ended | End time |
---|---|---|---|---|---|
Patrick | Heat in excess of 38 degrees. Teleops unable to complete operations | 14:00 | 19:59 | ||
Patrick | Radio server ceased operating which resulted in all terminal radios to stop working | 04:00 | 05:59 | ||
Maritime Container Services | DP World cancelled all slots as per the 1-stop notifications | 17:00 | 00:00 | ||
Panda International Transport | Unexpected safety issues | 11:00 | 12:00 | ||
R A Campbell | Extensive delays from Link Road to Mascot. Domestic Airport congestion causing large delays to Port | 10:00 | 11:00 | ||
DP World | Difficulty involving the Stevedore's personnel involved in road operations. This could not reasonably be avoided by the Stevedore | 09:00 | 10:00 | ||
R A Campbell | Artarmon Gore Hill Freeway at Reserve Road, closed Northbound due to broken down car | 10:00 | 11:00 | ||
R A Campbell | M7 delays due to broken down truck | 10:00 | 12:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 23:00 | 00:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 22:00 | 00:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 21:00 | 22:00 | ||
Maritime Container Services | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 20:00 | 00:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 20:00 | 21:09 | ||
Owens Transport | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 19:00 | 21:00 | ||
Maritime Container Services | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 19:00 | 21:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 19:00 | 00:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 19:00 | 22:00 | ||
Swift Transport | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 19:00 | 20:00 | ||
VISA Global Logistics | Broken down truck at Excell Street and Botany Road blocking entry and exit of street. Major port access area carriers unable to move their vehicles | 18:00 | 19:00 | ||
Patrick | Messaging halted between Patrick & 1-Stop servers, which resulted in carriers not being able to manifest containers to trucks | 04:00 | 07:59 | ||
JJL Transport Pty Ltd | Breakdown on M5 causing congestion and major delays | 11:00 | 12:00 | ||
Murrell Freight Services | Breakdown on M5 causing congestion and major delays | 11:00 | 12:00 | ||
JJL Transport Pty Ltd | Breakdown on M5 causing congestion and major delays | 10:00 | 11:00 | ||
Khosa Transport Pty Ltd | Congestion on M5 causing major delays | 09:00 | 10:00 | ||
JJL Transport Pty Ltd | Breakdown on M5 tunnel causing congestion and major delays | 09:00 | 10:00 | ||
Apex Transport Solutions | Truck on fire on M5 motorway causing major delays | 13:00 | 16:00 | ||
Murrell Freight Services | Accident on M5 causing major delays | 07:00 | 08:00 | ||
Hutchison | High winds caused ASC blocks to topple unable to service vehicles | 15:30 | 18:00 | ||
Murrell Freight Services | High winds caused ASC block at Hutchison to topple unable to service Murrell vehicle | 04:00 | 09:00 | ||
Macleay Valley Transport | M1 closed due to accident and truck fire | 17:00 | 18:00 | ||
DP World | Adverse weather conditions (high winds) resulted in terminal operations ceasing | 12:00 | 14:59 | ||
Australian Container Freight | Issue at Patrick due to hazardous conditions also manifesting issues caused extensive delays | 23:00 | 00:00 | ||
Australian Container Freight | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 19:00 | 20:00 | ||
Patrick | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 17:00 | 20:00 | ||
Patrick | Extreme heat which exceeded 38 degrees. Teleop work unable to be completed | 10:30 | 17:00 | ||
PJG Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 15:00 | 16:00 | ||
JJL Transport Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 14:00 | 15:00 | ||
NSW Container Solutions Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 14:00 | 15:00 | ||
JJL Transport Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 14:00 | 15:00 | ||
Ceva Logistics | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 14:00 | 15:00 | ||
JJL Transport Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 13:00 | 15:00 | ||
Price & Speed Container | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 13:00 | 14:00 | ||
Jetset Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 13:00 | 14:00 | ||
Alliance Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 13:00 | 14:00 | ||
PJG Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
JJL Transport Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
Brysay | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
J & J Robertson & Sons Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
J & J Robertson & Sons Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 14:00 | ||
NSW Container Solutions | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
JAS Transport Services | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 14:00 | ||
NSW Container Solutions Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
Joe Cahill Vic Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 12:00 | 13:00 | ||
Murrell Freight Services | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 12:00 | ||
Owens Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 14:00 | ||
PJG Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 16:00 | ||
Diesel Plus Transport | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 12:00 | ||
Sydney Port Logistics | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 12:00 | ||
Address Freight Logistics | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 12:00 | ||
JAS Transport Services | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 14:00 | ||
JJL Transport Pty Ltd | 1stop outage on 27 December 2017. Carriers unable to manifest slots | 11:00 | 12:00 | ||
Murrell Freight Services | Closure of QUBE empty park due to high winds. Vehicle redirected to MCS Cooks River. | 17:00 | 23:00 | ||
Patrick | Extreme heat which exceeded 38 degrees. Teleop work unable to be completed. | 12:30 | 13:59 | ||
Owens Transport | Traffic congestion in Coal Pier Road caused major port delays. | 16:00 | 17:00 | ||
R A Campbell | Accident on M5. Traffic congestion to port area. | 12:00 | 13:00 | ||
Murrell Freight Services | Truck fire on Hume Highway. Both trucks were stopped from 00:40 until 02:23 unable to get back in time to Port Kembla and change shift to come back to Port Botany. All slots had to be listed. | 04:00 | 05:00 | ||
DP World | Severe Weather at Terminal. Wind gusts in excess of 70kmph. Operations halted, container grids evacuated causing safety concerns | 19:00 | 20:00 | ||
Patrick | Import slots cancelled due to extreme weather and lightening | 14:00 | 14:59 | ||
DP World | Severe weather event resulting in evacuation of yard and halt to whole of operations | 00:30 | 03:59 | ||
R A Campbell | Accident on the M5 - Bexley Road off ramp at M5 east motorway | 06:00 | 07:00 | ||
Patrick | Database locked which prevented messaging between Camco gates & Terminal Operating System. No trucks could swipe on at the gate | 13:10 | 14:59 | ||
Hutchison | Terminal network failure | 08:00 | 06:00 | ||
Patrick | Loss of communication between Autostrads & TOS due to firewall outage. Full terminal outage | 14:00 | 16:59 | ||
Alliance Transport | M5 east motorway, broken down truck between Beverley Hills and Kingsgrove | 16:00 | 17:00 | ||
Alliance Transport | M5 east motorway, broken down truck between Beverley Hills and Kingsgrove | 14:00 | 15:00 | ||
Centreport | Customs ICS down, unable to pay duty | 07:00 | 08:00 | ||
Centreport | Customs ICS down, unable to pay duty | 04:00 | 05:00 | ||
Imex Shipping | Customs ICS down, unable to pay duty | 04:00 | 05:00 | ||
Maritime Container Services | Customs ICS down, unable to pay duty | 23:00 | 02:00 | ||
FCL Transport Services Pty Ltd | Customs ICS down, unable to pay duty | 20:00 | 00:00 | ||
Maritime Container Services | Customs ICS down, unable to pay duty | 18:00 | 00:00 | ||
Centreport | Customs ICS down, unable to pay duty | 16:00 | 17:00 | ||
Centreport | Unable to pay duty as Customs ICS crashed | 15:00 | 16:00 | ||
Owens Transport | Hutchison portal system outage unable to manifest | 15:00 | 17:00 | ||
JJL Transport Pty Ltd | M5 motorway incident | 15:00 | 16:00 | ||
Icehouse Logistics Pty Ltd | King Georges Road closed in both directions persons trapped extensive delays | 08:00 | 08:00 | ||
R A Campbell | Car into pole at Wiley Park Punchbowl. Extensive delays | 07:00 | 08:00 | ||
R A Campbell | Car into pole at Wiley Park Punchbowl. Extensive delays | 07:00 | 08:00 | ||
J & J Robertson & Sons Transport | Traffic congestion on Coal Pier Road causing extensive delays to Port | 13:00 | 14:00 | ||
Patrick | High winds causing truck operations to cease | 03:00 | 03:59 | ||
FCL Transport Services Pty Ltd | Vehicle breakdown in M5 tunnel | 16:00 | 17:00 | ||
DP World | Terminal impacted by high winds | 16:00 | 21:00 | ||
Hutchison | Adverse weather conditions affecting terminal safety | 16:00 | 22:00 | ||
Hutchison | Adverse weather event causing safety concerns | 12:00 | 15:00 | ||
Patrick | Terminal impacted by high winds | 12:00 | 18:59 | ||
DP World | Vessel operations halted due to extreme winds impacting the Sydney Coast and Metropolitan areas | 09:00 | 18:00 | ||
Patrick | Telstra outage resulted in gate system outage. Unable to process trucks through gate | 10:00 | 12:59 | ||
R A Campbell | M5 motorway closed due to major accident at Kingsgrove. Eastbound lanes closed | 07:00 | 08:00 | ||
Alliance Transport | Motor vehicle accident causing extensive delays on M5 motorway eastbound | 08:00 | 09:00 | ||
Price & Speed Container | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 13:00 | 14:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 00:00 | 01:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 16:00 | 02:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 01:00 | 02:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 01:00 | 14:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 20:00 | 21:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 18:00 | 19:00 | ||
J & J Robertson & Sons Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 18:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 19:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 00:00 | ||
J & J Robertson & Sons Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 16:00 | 17:00 | ||
Alliance Transport | Boom gate not operating at Hutchsion, drivers delayed existing facility, unable to make Patrick slot due to issue at other terminal | 05:00 | 06:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 01:00 | ||
R A Campbell | Accident on M5 east motorway significant delays | 14:00 | 15:00 | ||
Patrick | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 20:59 | ||
Price & Speed Container | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 23:00 | 00:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 21:00 | 22:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 20:00 | 21:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 22:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 01:00 | 04:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 21:00 | 23:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 21:00 | 00:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 09:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 05:00 | 06:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 05:00 | 06:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 22:00 | 00:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 22:00 | 23:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 14:00 | 15:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 14:00 | 15:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 14:00 | 15:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 14:00 | 15:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 16:00 | 21:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 14:00 | 16:00 | ||
Topline Transport Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 14:00 | 15:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 12:00 | 13:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 12:00 | 13:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 12:00 | 13:00 | ||
Kialla Transport Operations Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 11:00 | 15:00 | ||
GMS Transport Carrier | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Icehouse Logistics Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 05:00 | 17:00 | ||
Revtrans | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 03:00 | 08:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 03:00 | 04:00 | ||
Owens Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 00:00 | 02:00 | ||
GMS Transport Carrier | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 17:00 | 18:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 16:00 | 17:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 16:00 | 17:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 15:00 | 16:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 15:00 | 16:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 15:00 | 16:00 | ||
Lovatt Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 15:00 | 16:00 | ||
Kialla Transport Operations Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 11:00 | 15:00 | ||
D & K Scott Transport Services Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 15:00 | ||
Maritime Container Services | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 07:00 | 08:00 | ||
Alliance Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 15:00 | 16:00 | ||
Revtrans | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 07:00 | ||
Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 06:00 | 11:00 | |||
Tarmil Transport | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 04:00 | 05:00 | ||
Khosa Transport Pty Ltd | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 05:00 | 14:00 | ||
Brysay | Maersk cyber attack issue carriers. Maersk unable to release E-IDO's for carriers to pick up containers | 05:00 | 14:00 | ||
DP World | Safety concern within yard, HAZMAT required on site | 04:15 | 06:59 | ||
Sea and Road Express | ICS Payment system error at Stevedore. Payment not showing as clear 3 hours prior to slot | 13:00 | 14:00 | ||
Patrick | Heavy fog resulting in all R&D operations to cease | 03:00 | 06:59 | ||
DP World | Gas leak at Bulk Liquid Terminal. Operations halted | 23:00 | 23:59 | ||
GPSM | M5 congestion due to accident due to blackout effecting large parts of Sydney area. M5 tunnel closure | 17:00 | 18:00 | ||
Panucci Transport | M5 congestion due to accident due to blackout effecting large parts of Sydney area. M5 tunnel closure | 17:00 | 18:00 | ||
JJL Transport Pty Ltd | M5 congestion due to accident due to blackout effecting large parts of Sydney area. M5 tunnel closure | 16:00 | 20:00 | ||
GPSM | M5 congestion due to accident due to blackout effecting large parts of Sydney area. M5 tunnel closure | 16:00 | 17:00 | ||
Hutchison | Carrier left container door unlocked and damaged machinery. Due to safety concerns operations ceased | 08:00 | 13:00 | ||
DP World | Unplanned system outage | 09:00 | 09:59 | ||
R A Campbell | DP World cancelled slots so carrier was unable to pick up container from Patrick | 09:00 | 10:00 | ||
Patrick | Picket line due to industrial action causing blocking of access to terminal | 13:00 | 17:59 | ||
Patrick | Hazardous spill in truck grids. Operations ceased until return to work issued by HAZMAT | 17:00 | 18:59 | ||
Sinadinos Haulage | Traffic incident due to fallen tree | 17:00 | 18:00 | ||
Patrick | MUA Industrial Action which ceased operations | 14:00 | 16:59 | ||
R A Campbell | Accident on M5 motorway - truck held up in significant delays | 06:00 | 07:00 | ||
Patrick | Industrial action | 13:30 | 21:59 | ||
Hutchison | Severe weather event caused containers to topple | 22:00 | 14:00 | ||
Centreport | Medical emergency for vehicle driver | 15:00 | 16:00 | ||
Medical emergency for vehicle driver | 10:00 | 11:00 | |||
Severe weather. Storm caused lightening strike at Patrick and held up trucks in terminal | 20:00 | 00:00 | |||
Apex Transport Solutions | UFE held vehicles up at Patrick, unable to make DPW slot | 22:00 | 23:00 | ||
Patrick | Terminal operating system outage | 21:20 | 23:59 | ||
Patrick | Telstra system outage | 10:00 | 13:59 | ||
Patrick | National system issue caused terminal operating systems data issue | 19:00 | 22:59 | ||
Patrick | Extreme heat reaching over 38 degrees | 17:00 | 17:59 | ||
Patrick | Extreme heat reaching over 38 degrees | 16:00 | 16:59 | ||
Patrick | Extreme heat reaching over 38 degrees | 13:00 | 15:59 | ||
Lighthouse Consulting | Traffic congestion at port access roads | 12:00 | 13:00 | ||
Warringah Crane And Transport | Traffic congestion at port access roads | 11:00 | 12:00 | ||
Freightlinx | Accident on M1 motorway caused major traffic delays | 20:00 | 21:00 | ||
Sydneywide Containers | Traffic incident at Bankstown, caused major delays. Driver stopped to give assistance to injured | 03:00 | 04:00 | ||
Patrick | Extreme heat reaching over 38 degrees | 13:00 | 14:59 | ||
Patrick | Terminal operating system down | 06:00 | 08:59 | ||
Patrick | Terminal control tower struck by lightning at 1523 which resulted in a LCS panel's power supply being damaged - all operations ceased | 15:00 | 16:59 | ||
GMS Transport Carrier | Traffic congestion on Coal Pier Road causing extensive delays to Port | 12:00 | 13:00 | ||
Owens Transport | Traffic congestion on roads in and around Port Botany | 15:00 | 16:00 | ||
GMS Transport Carrier | Traffic congestion on roads in and around Port Botany | 16:00 | 17:00 | ||
J & J Robertson & Sons Transport | Traffic congestion on roads in and around Port Botany | 13:00 | 14:00 | ||
J & J Robertson & Sons Transport | Containers blown over in yard due to high winds | 06:00 | 07:00 | ||
Macleay Valley Transport | Fire closing the Pacific Highway between Kempsey & Newcastle | 20:00 | 01:00 | ||
Macleay Valley Transport | Fire closing the Pacific Highway between Kempsey & Newcastle | 15:00 | 20:00 | ||
DP World | Service disruption to DPW terminal operating system all DPW sites in Australia affected | 21:00 | 22:00 | ||
P&O Trans Australia | Severe weather - high winds | 21:00 | 22:00 | ||
DP World | Unplanned system outage, lost terminal operating system | 23:00 | 00:00 | ||
Sinadinos Haulage | M5 incident causing extensive traffic delays | 07:00 | 08:00 | ||
Sinadinos Haulage | M5 incident causing extensive traffic delays | 12:00 | 13:00 | ||
R A Campbell | M5 and M7 accident causing extensive traffic delays | 09:00 | 10:00 | ||
S.W. Australian Transport | Truck rollover on M7 causing extensive traffic delays | 09:00 | 10:00 | ||
Adam Hester Transport | Hanjin receivership | 13:00 | 14:00 | ||
Murrell Freight Services | Hanjin receivership | 17:00 | 18:00 | ||
AST Services | Hanjin receivership | 17:00 | 18:00 | ||
H Brightwell & Sons | Hanjin receivership | 14:00 | 15:00 | ||
1-Stop Logistics | Hanjin receivership | 07:00 | 08:00 | ||
BR Williams Customs & Freight Forwarding | Hanjin receivership | 06:00 | 13:00 | ||
P&O Trans Australia | Hanjin receivership | 15:00 | 16:00 | ||
Sydney Sideloaders | Hanjin receivership | 13:00 | 14:00 | ||
Sullivans Transport | Hanjin receivership | 12:00 | 13:00 | ||
J & E Vella | Hanjin receivership | 12:00 | 13:00 | ||
Allied Pickfords Sydney | Hanjin receivership | 11:00 | 12:00 | ||
Kit Bros Transport | Hanjin receivership | 11:00 | 07:00 | ||
KC & ML Parker | Hanjin receivership | 09:00 | 10:00 | ||
Costrans | Hanjin receivership | 09:00 | 10:00 | ||
GMS Transport Carrier | Tanker rollover on Wentworth Avenue all arterial roads surrounding Port precinct were affected | 16:00 | 17:00 | ||
Alliance Transport | Tanker rollover on Wentworth Avenue all arterial roads surrounding Port precinct were affected | 10:00 | 11:00 | ||
Sinadinos Haulage | Tanker rollover on Wentworth Avenue all arterial roads surrounding Port precinct were affected | 08:00 | 12:00 | ||
R A Campbell | Tanker rollover on Wentworth Avenue all arterial roads surrounding Port precinct were affected | 06:00 | 07:00 | ||
S.W. Australian Transport | Tanker rollover on Wentworth Avenue all arterial roads surrounding Port precinct were affected | 05:00 | 08:00 | ||
Sinadinos Haulage | Five car accident at Somersby which resulted in delay of container truck to the port | 08:00 | 09:00 | ||
S.W. Australian Transport | Issue arising at Carriers office causing unforeseen event and no trucks able to carry out bookings | 07:00 | 10:00 | ||
S.W. Australian Transport | Issue arising at Carriers office causing unforeseen event and no trucks able to carry out bookings | 04:00 | 10:00 | ||
S.W. Australian Transport | Issue arising at Carriers office causing unforeseen event and no trucks able to carry out bookings | 04:00 | 09:00 | ||
S.W. Australian Transport | Issue arising at Carriers office causing unforeseen event and no trucks able to carry out bookings | 03:00 | 16:00 | ||
Sinadinos Haulage | Truck breakdown on Foreshore Road | 15:00 | 16:00 | ||
Sinadinos Haulage | Accident on M5 motorway - truck held up in delay | 11:00 | 12:00 | ||
Seaco Freight Services | Accident on M5 motorway - truck held up in delay | 08:00 | 14:00 | ||
Johnstons Transport | Truck breakdown on Foreshore Road | 07:00 | 11:00 | ||
BCQ Holdings | Truck breakdown on Foreshore Road | 07:00 | 12:00 | ||
Flincept | Truck breakdown on Foreshore Road | 07:00 | 09:00 | ||
Patrick | IT system breakdown | 16:00 | 16:59 | ||
Patrick | Machinery outages caused by adverse weather | 20:00 | 23:59 | ||
DP World | Adverse weather conditions , storm and high winds speeds. Pilot services closed | 06:00 | 09:00 | ||
Patrick | Activities ceased due to adverse weather conditions | 20:00 | 21:59 | ||
Patrick | IT systems breakdown. ATS system | 19:00 | 22:59 | ||
Patrick | IT systems breakdown automated yard shutdown | 12:01 | 13:59 | ||
Braileys Transport | IT systems breakdown at Patrick. Unable to get export container of truck, so needed to bring import container back to Port Kembla | 12:00 | 13:00 | ||
Johnstons Transport | Trailer tyre blown on way to terminal. Delays caused | 12:00 | 13:00 | ||
Patrick | IT systems breakdown gate system issues | 08:00 | 09:59 | ||
Patrick | IT systems breakdown gate system issues | 07:00 | 07:59 | ||
EMT Container Movements | Hutchison issues during transhipment caused timezones to be missed at other terminals | 07:00 | 13:00 | ||
Patrick | IT systems breakdown terminal shutdown | 22:01 | 23:59 | ||
Brysay | M5 congestion due to accident | 06:00 | 07:00 | ||
Patrick | Terminal operating computer failure | 17:00 | 17:59 | ||
Patrick | Camco messaging gate system failure | 20:00 | 21:59 | ||
Sinadinos Haulage | Accident M5 motorway | 14:00 | 14:59 | ||
J & J Robertson & Sons Transport | Accident M5 motorway | 13:00 | 13:59 | ||
Warehouse Solutions International | Accident M5 motorway | 13:00 | 13:59 | ||
Patrick | Terminal operating computer failure | 14:00 | 14:59 | ||
Sydneywide Containers | RMS spot check on vehicle | 08:00 | 15:00 | ||
Sinadinos Haulage | Accident M5 motorway | 06:00 | 06:59 | ||
Sinadinos Haulage | Accident on M1 motorway | 09:00 | 09:59 | ||
J & J Robertson & Sons Transport | Truck rollover accident on Foreshore Road | 13:00 | 14:59 | ||
Imex Shipping | Accident M5 motorway | 07:00 | 07:59 | ||
Patrick | Severe weather conditions - lightning storm - safety concerns | 13:00 | 15:03 | ||
Patrick | Extreme heat - terminal closed due to staff regulations | 13:00 | 15:59 | ||
DP World | Extreme heat - terminal closed due to staff regulations | 12:00 | 15:59 | ||
Patrick | Extreme heat - terminal closed due to staff regulations | 11:00 | 16:59 | ||
J & J Robertson & Sons Transport | Power lines down on Princess highway - truck held up in delay | 15:00 | 16:00 | ||
R A Campbell | Accident on M5 motorway - truck held up in delay | 12:00 | 13:00 | ||
DP World | Adverse weather conditions - safety concern | 14:00 | 15:00 | ||
Hutchison | Extreme heat - terminal closed due to staff regulations | 10:00 | 14:02 | ||
Patrick | Severe weather conditions - lightning storm and high winds | 10:00 | 11:59 | ||
DP World | Severe weather conditions high winds safety concerns | 09:00 | 13:00 | ||
Patrick | Extreme heat - terminal closed due to staff regulations | 13:00 | 15:59 | ||
DP World | Terminal operating system failure | 14:00 | 17:00 | ||
Patrick | Extreme heat - terminal closed due to staff regulations | 12:00 | 19:59 | ||
Canberra Container Services | Accident on M1 motorway - motorway closed truck held up in delay | 14:00 | 15:00 | ||
Patrick | Hazardous tanker - emergency evacuation | 14:00 | 17:59 | ||
DP World | Severe weather high winds | 05:00 | 06:00 | ||
DP World | Radio server failure. Communication lost to yard machinery | 20:00 | 21:00 | ||
DP World | Terminal operating system, including phone and email outage | 19:00 | 21:59 | ||
DP World | Terminal operating system, including phone and email outage | 03:00 | 03:59 | ||
Patrick | Heavy rain which flooded truck grids lane 1 to 24 | 22:00 | 22:59 | ||
Hutchison | Industrial issues | 16:00 | 20:00 | ||
Hutchison | Industrial issues | 06:00 | 14:00 | ||
Hutchison | Industrial issues | 06:00 | 14:00 | ||
Hutchison | Industrial issues | 06:00 | 22:00 | ||
Hutchison | Industrial Issues | 06:00 | 22:00 | ||
Hutchison | Industrial issues | 07:00 | 22:00 | ||
Price & Speed Container | Unable to gain access to Hutchison Ports due to industrial issues | 07:00 | 08:00 | ||
Hutchison | Ongoing industrial issues | 06:00 | 06:00 | ||
DP World | Terminal Operating system failure affecting all DP World terminals | 17:00 | 01:59 | ||
Patrick | Terminal outage nationwide data communications and terminal road delivery and receival systems affected | 22:00 | 03:59 | ||
Sinadinos Haulage | Theft at carrier yard | 06:00 | 07:00 | ||
DP World | Truck broken down at main gate | 16:00 | 16:59 | ||
DP World | Power outage caused terminal operations to shutdown - lighting and equipment presenting unsafe environment for operations | 22:00 | 02:00 | ||
Patrick | Weather conditions and high wind | 11:00 | 16:59 | ||
DP World | Weather conditions and high wind | 11:00 | 16:59 | ||
Hutchison | Weather conditions and high wind | 11:00 | 17:59 | ||
Patrick | Major terminal system failure | 06:00 | 07:59 | ||
Sinadinos Haulage | Major road accident on M1 Pacific Highway | 12:00 | 14:59 | ||
Sinadinos Haulage | Major incident on M5 east tunnel | 07:00 | 09:03 | ||
R A Campbell | Warehouse flooded during severe storms. Unable to access stock | 13:00 | 14:00 | ||
Apex Transport Solutions | Severe weather conditions experienced - trucks unable to be serviced | 20:00 | 21:00 | ||
Hutchison | Severe weather conditions experienced across Sydney - high winds | 17:00 | 06:59 | ||
Patrick | Severe weather conditions experienced across Sydney - high winds | 14:00 | 06:59 | ||
DP World | Severe weather conditions experienced across Sydney - high winds | 13:00 | 06:59 | ||
Hutchison | Power outage and complete system crash that ceased operations | 19:00 | 05:59 | ||
R A Campbell | Major incident - M5 tunnel closure | 12:00 | 13:59 | ||
Alliance Transport | Major road incident on General Holmes Drive | 09:00 | 10:00 | ||
J & J Robertson & Sons Transport | Major road incident on General Holmes Drive | 09:00 | 10:00 | ||
DP World | High winds and safety concerns | 15:00 | 19:59 | ||
Patrick | National terminal systems failure | 13:00 | 16:59 | ||
Patrick | Severe weather issues - heat | 16:00 | 16:59 | ||
Landbridge Transport | Major Road incident at Rhodes | 12:00 | 13:00 | ||
DP World | Technical issues with Telstra outage | 22:00 | 01:59 | ||
Patrick | Operations ceased due to high wind | 14:50 | 16:59 | ||
DP World | Operations ceased due to high wind | 14:00 | 17:00 | ||
DP World | Operations ceased due to high wind | 20:00 | 22:00 | ||
Patrick | Operations ceased due to high wind | 20:00 | 22:59 | ||
Patrick | Terminal suffered major IT incident to operating system | 17:00 | 19:59 | ||
Hutchison | Severe weather conditions - high winds | 15:00 | 18:00 | ||
Patrick | High winds causing safety concerns as wind gusts over 90 km per hour | 15:00 | 16:59 | ||
Hutchison | Weather event, heavy fog | 07:00 | 08:00 | ||
DP World | Severe weather and safety issues | 20:00 | 18:59 | ||
Hutchison | Severe weather and safety issues | 20:00 | 06:00 | ||
Patrick | Severe weather and safety issues | 20:00 | 18:59 | ||
DP World | Severe weather and safety concerns | 19:00 | 21:00 | ||
Brysay | Oil spill in Patrick terminal affected Reefer area and those carriers requiring Reefer containers being serviced | 12:00 | 13:00 | ||
Ceva Logistics | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 12:00 | 13:00 | ||
Careys Freight Lines | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 12:00 | 13:00 | ||
Maritime Container Services | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 11:00 | 12:00 | ||
Truckspeed | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 10:00 | 11:00 | ||
Swift Transport | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 10:00 | 11:00 | ||
Owens Transport | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 10:00 | 11:00 | ||
Import and Export Logistics | Oil spill in Patrick terminal affected Reefer area and thus those carriers requiring Reefer containers being serviced | 09:00 | 10:00 | ||
DP World | Adverse weather conditions, DPW operated under limited capacity | 06:00 | 12:59 | ||
Imex Shipping | Carrier unable to be serviced due to shipping line error in flagging GEN commodity when it was HAZ | 23:00 | 00:00 | ||
SICTL | Containers collapsed due to high winds damaging infrastructure | 22:00 | 13:59 | ||
Murrell Freight Services | Truck Accident in Dapto | 21:00 | 23:59 | ||
SICTL | Containers collapsed due to high winds damaging infrastructure | 22:00 | 14:59 | ||
Patrick | High winds | 09:00 | 09:59 | ||
SICTL | Containers collapsed due to high winds damaging infrastructure | 08:00 | 12:59 | ||
DP World | High winds | 08:00 | 22:59 | ||
SICTL | Machinery lasers affected by heavy fog | 06:00 | 08:59 | ||
Patrick | Terminal closed due to heavy fog | 06:00 | 08:59 | ||
SICTL | Internal yard accident in ASC fence caused by truck driver | 17:00 | 17:59 | ||
DP World | System outage | 22:00 | 03:59 | ||
Patrick | System outage | 22:00 | 14:59 | ||
J.A.S. Transport Services | M5 East Tunnel closure due to accident | 12:00 | 13:00 | ||
DP World | High winds | 15:00 | 17:00 | ||
Murrell Freight Services | Held up at Stevedore due to issue outside of carrier's control | 06:00 | 07:00 | ||
Patrick | Qube Truck rolled over | 00:00 | 06:59 | ||
SICTL | Automatic Stacking Crane (ASC) control systems failure | 13:00 | 15:00 | ||
Patrick | Oil spill on truck grids | 17:00 | 11:59 | ||
Patrick | Terminal closed due to heavy weather conditions | 16:00 | 16:59 | ||
DP World | Terminal closed due to heavy weather conditions | 15:00 | 16:30 | ||
DP World | Terminal closed due to heavy weather conditions | 13:00 | 16:00 | ||
DP World | Terminal closed due to high winds | 08:00 | 10:59 | ||
DP World | Terminal closed due to smoke caused by Amcor fire | 22:00 | 00:59 | ||
DP World | Terminal closed due to smoke caused by Amcor fire | 21:00 | 04:59 | ||
DP World | Terminal closed due to smoke caused by Amcor fire | 11:00 | 19:00 | ||
Alliance Transport | M5 tunnel incident | 13:00 | 14:00 | ||
Patrick | Fire in terminal near truck grids | 08:00 | 10:59 | ||
Patrick | Terminal closed due to high winds | 15:00 | 18:59 | ||
DP World | Terminal closed due to high winds | 15:00 | 16:59 | ||
Lawrence Transport | Traffic issue on M5 | 07:00 | 09:30 | ||
Murrell Freight Services | Tree fallen on Bulli Tops blocking traffic coming from F6 | 00:00 | 23:59 | ||
Patrick | System outage | 08:00 | 14:00 | ||
AST Services | M5 tunnel closed due to traffic accident | 23:00 | 23:59 | ||
Adam Hester Transport | M5 tunnel closed due to traffic accident | 19:00 | 19:59 | ||
Apex Transport Solutions | M5 tunnel closed due to traffic accident | 16:00 | 21:00 | ||
Yuni Line | M5 tunnel closed due to traffic accident | 16:00 | 16:59 | ||
Adam Hester Transport | M5 tunnel closed due to traffic accident | 16:00 | 17:00 | ||
Owens Transport | M5 tunnel closed due to traffic accident | 16:00 | 16:59 | ||
J & J Robertson & Sons Transport | M5 tunnel closed due to traffic accident | 15:00 | 15:59 | ||
Watex | M5 tunnel closed due to traffic accident | 15:00 | 16:00 | ||
Owens Transport | M5 tunnel closed due to traffic accident | 15:00 | 15:59 | ||
ULD Transport | M5 tunnel closed due to traffic accident | 12:00 | 13:00 | ||
Revtrans | M5 tunnel closed due to traffic accident | 12:00 | 13:00 | ||
GMS Transport Carrier | M5 tunnel closed due to traffic accident | 12:00 | 12:59 | ||
Owens Transport | M5 tunnel closed due to traffic accident | 12:00 | 12:59 | ||
Revtrans | M5 tunnel closed due to traffic accident | 11:00 | 12:00 | ||
Stockwell International | M5 tunnel closed due to traffic accident | 11:00 | 12:00 | ||
Import and Export Logistics | M5 tunnel closed due to traffic accident | 11:00 | 12:00 | ||
Watex | M5 tunnel closed due to traffic accident | 10:00 | 11:00 | ||
GLT Australia | M5 tunnel closed due to traffic accident | 10:00 | 12:00 | ||
Brysay | M5 tunnel closed due to traffic accident | 08:00 | 08:59 | ||
M.A.N. Transport | M5 tunnel closed due to traffic accident | 08:00 | 17:00 | ||
Roadwise | M5 tunnel closed due to traffic accident | 08:00 | 11:00 | ||
Evangelos Mantzikopous | M5 tunnel closed due to traffic accident | 07:00 | 12:00 | ||
Murrell Freight Services | M5 tunnel closed due to traffic accident | 00:00 | 23:59 | ||
DP World | Congestion caused by accident on Botany road | 16:00 | 17:59 | ||
GLT Australia | Gridlock on Bumborah Pt Road and Simblist caused by accident on Botany Rd | 16:00 | 15:59 | ||
DP World | Multiple car accident at Botany and Bumborah Point roads | 14:00 | 15:59 | ||
Freightlinx | Somersby Industrial Area closed, roads closed in both directions due to bushfires | 04:00 | 12:30 | ||
Patrick | Simblist and Bumborah Roads closed- debris on road due to high winds | 16:00 | 19:00 | ||
DP World | High Winds and Road closures - Simblist and Bumborah - debris on road due to high winds | 13:00 | 18:59 | ||
Patrick | Terminal closed due to high winds | 12:30 | 16:59 | ||
DP World | Terminal closed due to high winds | 21:00 | 22:00 | ||
Patrick | Terminal closed due to high winds | 22:00 | 01:59 | ||
DP World | Terminal closed due to high winds | 15:00 | 16:59 | ||
Patrick | Terminal closed due to high winds | 15:00 | 15:59 | ||
DP World | Terminal closed due to high winds | 13:00 | 14:59 | ||
DP World | Terminal closed due to high winds | 11:00 | 16:59 | ||
Patrick | System Outage | 10:00 | 18:00 | ||
DP World | OH&S briefing with labour after crane incident | 08:00 | 09:59 | ||
DP World | Unsafe to work due to yard incident - machinery | 15:00 | 16:00 | ||
Patrick | Terminal closed due to high winds and rain | 20:00 | 00:59 | ||
DP World | Terminal closed due to high winds and rain | 19:00 | 23:00 | ||
Patrick | Terminal closed due to high winds and rain | 19:00 | 22:59 | ||
Patrick | Terminal closed due to heavy fog | 01:00 | 04:59 | ||
Patrick | Unsafe to work due to oil spill on truck grids | 21:00 | 13:59 | ||
DP World | Terminal closed due to heavy fog | 07:00 | 08:00 | ||
Patrick | Terminal closed due to heavy fog | 06:00 | 09:00 | ||
DP World | System outage | 11:00 | 14:00 | ||
Patrick | Terminal closed due to high winds and rain | 10:00 | 12:59 | ||
Patrick | Terminal closed due to fog | 05:00 | 06:59 | ||
Patrick | Terminal closed due to fog | 03:00 | 09:00 | ||
Patrick | Terminal closed due to fog | 06:00 | 00:59 | ||
Patrick | System outage | 17:00 | 20:59 | ||
Patrick | System outage | 11:00 | 13:59 | ||
Patrick | System Outage | 11:00 | 13:59 | ||
J.A.S. Transport Services | M5 tunnel break down truck | 07:20 | 09:10 | ||
Patrick | Terminal closed due to high winds and containers being blown off stacks during southerly change that passed through Botany | 20:00 | 22:30 | ||
DP World | Terminal operations ceased due to temperatures rising above 38 degrees -e mployees unable to service broken down machinery | 12:00 | 18:00 | ||
Patrick | Terminal closed due to extreme heat | 12:00 | 17:00 | ||
DP World | Due to extreme heat, machinery experiencing continual breakdowns - DP World EA heat agreement calls for all operations to cease | 18:00 | 22:00 | ||
Patrick | Terminal had limited straddles from 15:00 to 17:00 and cancelled slots from 17:00 to and including 21:00 - straddles were affected from overheating and air conditioning issues due to extreme weather | 15:00 | 21:59 | ||
DP World | Multiple breakdowns due to heavy machinery overheating due to extreme heat | 14:00 | 18:00 | ||
Patrick | Extreme hot weather conditions affected health and safety issues for staff | 12:00 | 15:00 | ||
DP World | MUA meeting | 13:00 | 16:00 | ||
DP World | MUA Industrial Action | 03:00 | 10:00 | ||
DP World | MUA Industrial Action | 19:00 | 23:00 | ||
DP World | MUA Industrial Action | 11:00 | 15:00 | ||
DP World | Boarder security operations | 08:00 | 12:00 | ||
DP World | Gale Force Winds | 12:00 | 16:00 | ||
Patrick | High winds | 00:00 | 01:00 | ||
Patrick | High Winds | 21:00 | 22:00 | ||
DP World | System Outage | 07:00 | 08:00 | ||
CA Link International | M5 tunnel closed due to traffic accident | 20:00 | 21:00 | ||
Roadwise | M5 tunnel closed due to traffic accident | 17:00 | 18:00 | ||
Adam Hester Transport | M5 tunnel closed due to traffic accident | 16:00 | 17:00 | ||
J & J Robertson & Sons Transport | M5 tunnel closed due to traffic accident | 16:00 | 17:00 | ||
Johnstons Transport | M5 tunnel closed due to traffic accident | 15:00 | 16:00 | ||
Lawrence Transport | M5 tunnel closed due to traffic accident | 12:00 | 13:00 | ||
Roadwise | Road closure due to fire | 00:00 | 01:00 | ||
Patrick | Accident within port precinct | 14:00 | 23:59 | ||
Import and Export Logistics | Truck accident | 16:00 | 17:00 | ||
PVG Transport | Truck accident | 08:00 | 13:00 | ||
Patrick | 1-Stop down time | 03:00 | 06:00 | ||
DP World | 1-Stop down time | 03:00 | 06:00 | ||
Carriers Transport | Traffic accident | 08:00 | 10:00 | ||
Patrick | High winds | 11:00 | 05:59 | ||
DP World | High winds | 10:00 | 12:00 | ||
Patrick | Heavy fog | 05:00 | 09:59 | ||
Patrick | MUA Action | 22:00 | 23:59 | ||
Patrick | MUA Action | 14:00 | 16:00 | ||
Patrick | MUA Action | 09:00 | 12:00 | ||
Patrick | MUA Action | 11:00 | 14:59 | ||
DP World | Extreme weather | 16:20 | 06:00 | ||
Patrick | Extreme weather | 15:00 | 06:59 | ||
Patrick | MUA Stoppage | 11:00 | 13:00 | ||
DP World | MUA action | 11:00 | 13:00 | ||
Patrick | IT system breakdown | 00:01 | 02:59 | ||
DP World | HAZ spill | 08:15 | 13:35 | ||
Patrick | MUA meeting extended | 14:00 | 16:00 | ||
Patrick | IT system breakdown | 02:00 | 06:00 | ||
Patrick | Unsafe due to fog | 08:00 | 09:59 | ||
Patrick | Unsafe due to fog | 05:00 | 04:00 | ||
Patrick | Unsafe working due to rain | 20:30 | 02:00 | ||
Patrick | Unsafe working due to rain | 02:00 | 04:00 | ||
Patrick | Computer system failure | 17:00 | 23:59 | ||
DP World | MUA strike action | 06:00 | 07:00 | ||
Patrick | Time zone cancelled due to weather | 09:00 | 13:00 | ||
Patrick | Unsafe working due to oil on grids | 15:00 | 02:00 | ||
Patrick | ATS processing system down | 11:00 | 03:59 | ||
Patrick | Unsafe working due to rain | 22:00 | 02:00 | ||
Patrick | Unsafe working due to rain | 00:00 | 14:00 | ||
DP World | Data base crash | 21:00 | 01:00 | ||
Patrick | Unsafe working due to rain | 19:25 | 23:05 | ||
BR Williams Customs & Freight Forwarding | Truck accident | 05:00 | 07:00 | ||
DP World | Service provider drop out | 14:58 | 18:00 | ||
Patrick | MUA action | 14:00 | 17:00 | ||
Patrick | High winds | 19:00 | 01:00 | ||
Patrick | Oil spill behind truck grids | 03:00 | 16:00 | ||
Patrick | Failed auto gate function | 02:00 | 13:59 | ||
Patrick | Computer outage | 16:00 | 22:00 | ||
Patrick | Flooding in yard | 17:00 | 23:00 | ||
Patrick | Heavy fog | 04:00 | 07:00 | ||
Carriers Transport | Extensive delays M4-M5 | 06:00 | 13:59 | ||
Patrick | Oil spill behind truck grids | 18:00 | 13:00 | ||
Patrick | Oil spill behind truck grids | 15:00 | 13:00 | ||
Patrick | Computer system failure | 23:00 | 04:00 | ||
Patrick | MUA meeting | 21:20 | 23:40 | ||
Murrell Freight Services | Mt Ousley closure | 17:00 | 17:00 | ||
Patrick | High winds | 22:00 | 23:59 | ||
Patrick | High winds | 14:00 | 22:00 | ||
Patrick | Computer system failure | 23:00 | 05:00 | ||
Patrick | Computer system failure | 05:00 | 13:00 | ||
DP World | Gas leak | 22:00 | 06:00 | ||
Patrick | Gas leak | 00:00 | 01:00 | ||
Patrick | Heavy fog | 04:00 | 10:00 | ||
DP World | Industrial action | 14:00 | 15:00 | ||
DP World | Industrial action | 13:30 | 17:00 | ||
Patrick | Industrial action | 12:00 | 20:00 | ||
Patrick | High winds | 15:00 | 17:07 | ||
Patrick | Oil spill at rear of truck grid | 12:00 | 15:00 | ||
Patrick | Industrial action | 07:00 | 08:59 | ||
DP World | High winds | 06:00 | 10:59 | ||
Patrick | Computer systems failure affecting Patrick nationwide | 01:00 | 06:00 | ||
DP World | Fire onboard Sinotrans Dalian - terminal ceased operations whilst fire brigade attended | 06:00 | 12:00 | ||
DP World | System outage | 10:10 | 11:30 | ||
Patrick | IT system breakdown | 14:00 | 16:00 | ||
Patrick | Emergency evacuation alarms were activated | 04:00 | 06:00 | ||
DP World | Terminal operating system (TOS) failure | 13:05 | 14:15 | ||
Patrick | Terminal closure due to power outage | 06:55 | 07:35 |